Centrifugal industrial fans represent the main component of extraction systems for air purification and filtration. They are the means by which the necessary extraction is carried out in all extraction systems.
Coral company in industrial aspiration world
LAST TOPICS
Insights
Paint booths
The choice of the best spray booths to buy first of all depends on the objects that need to be coated. Manufacturers must be given the information on data sheets of coating products in use.
Electrostatic filters
The evolution of electrostatic filters in mechanical engineering industry made aspiration and filtration systems for oil mists generated during tools cooling down efficient.
LAST REALIZATIONS
Case History
VOC aspiration and filtration system with Thermal Oxidizer
For the aspiration and filtration of VOC deriving from a paint machine, the following system has been realized.
Air aspiration and treatment system with bio-filtration
Extraction and air treatment system from storage and treatment areas of biological sludge, flow rates up to 70,000 m³ / h.
Aspiration and filtration system for coal boilers fumes
For smoke collection of three coal-fired boilers 3 AIRCOM sleeves filters were installed with demister, with a total treated air flow of 185,500 m3 / h.
Fresh news
The latest
The magnificent 800
In L’Economia del Corriere della Sera, an article dedicated to the 800 Champions companies, including Coral.
Train SRT dust aspiration system
An aspiration system for dust generated by rails grinding has been realized; this processing is carried out though a sander machine which is placed on the train wagon.
40 years of Coral Engineering
Coral Enginering, operative company of Coral Group in the design and installation of aspiration systems, achieves an important goal, appreciated by customers every day for honesty and professionalism.
LAST NEWS
Corporate
Coral Engineering new headquarters is operative
On 1th October 2012, Coral Engineering moved to the new headquarters.
Inauguration of a new area in Coral Engineering Vicenza headquarters
The new area of Coral Vicenza is an extension of technical and commercial offices for the design and realization of air aspiration and filtration systems.
Inauguration of a new area in Coral Engineering headquarters in Trezzano Rosa – Milan
On 19th September 2014, a new area of Coral Engineering factory in Trezzano Rosa – Milan has been inaugurated with all the managers of the group.